ABSTRAKSI: ABSTRAK Pada saat ini, sistem automasi industri menggunakan Programmable Logic Controller (PLC) untuk mengontrol suatu mesin industri. PLC memiliki prosesor yang dapat diprogram, sehingga memberikan keluaran sesuai dengan masukan yang diberikan. Dalam proses industri, monitoring terhadap mesin industri harus dilakukan setiap saat. Keadaan mesin industri dapat diketahui berdasarkan kondisi masukan dan keluaran PLC. Monitoring PLC dengan komputer sebagai antarmuka dengan user menggunakan kabel serial dan kabel bus mempunyai keterbatasan pada panjang kabel. Oleh karena itu, diperlukan suatu perancangan sistem monitoring PLC via Ethernet agar monitoring PLC dapat dilakukan dari jarak jauh. Pada saat ini, PLC sudah didukung oleh modul Ethernet sehingga monitoring PLC dapat dilakukan melalui jaringan Ethernet. Salah satu jenis modul Ethernet yang dapat menghubungkan PLC via Ethernet adalah jenis CJIW ETN-21. PLC OMRON CP1H dapat didukung oleh modul Ethernet jenis CJ1W ETN-21 sehingga monitoring terhadap PLC OMRON CP1H dapat dilakukan secara on line via Ethernet. Dalam tugas akhir ini, diimplementasikan sistem monitoring PLC OMRON CP1H via Ethernet. Modul Ethernet yang digunakan oleh PLC OMRON CP1H agar terhubung dengan jaringan Ethernet adalah CJ1W ETN-21. Sistem monitoring ini berbasis web sebagai antarmuka user dengan PLC, sehingga kondisi masukan dan keluaran PLC dapat diakses dari jarak jauh. Dari hasil implementasi ini, dapat diukur round trip time delay , throughput, dan packet loss antara komputer dengan PLC. Dari hasil pengukuran yang telah dilakukan, didapatkan hasil bahwa penambahan background traffic pada jaringan dan penambahan jumlah node yang mengakses modul Ethernet CJ1W ETN-21 dapat meningkatkan round trip time delay antara komputer dengan PLC dan mengurangi throughput. Background traffic dengan jenis paket UDP ternyata menambah round trip time delay lebih besar dibandingkan dengan background traffic dengan paket TCP. Packet loss mulai terjadi pada saat jaringan diberikan background traffic sebesar 96 %.

Kata Kunci : monitoring, PLC, jaringan, Ethernet.ABSTRACT: Nowadays, industrial automation system uses a Programmable Logic Controller (PLC) to control an industrial machine. PLC has a programmable processor, so the output is in accordance with the input given. In industrial processes, monitoring of industrial machinery has to be done at any time. Industrial machine state can be detected under the condition of input and output PLC. Monitoring PLC with a computer as an interface with the user using a serial cable and the bus cable has the limitation on the length of the cable. Therefore, we need a monitoring system of PLC via Ethernet that can be done remotely. At this time, the PLC has been supported by the Ethernet module so that the monitoring of the PLC can be done through an Ethernet network. One type of Ethernet module that can connect the PLC via Ethernet is a type CJIW ETN-21. PLC OMRON CP1H can be supported by the Ethernet module CJ1W type ETN-21 so that the monitoring of PLC OMRON CP1H can be done on line via Ethernet. In this Final Assignment, a monitoring system of PLC OMRON CP1H via Ethernet was implemented. Ethernet modules used by the PLC OMRON CP1H to connect with an Ethernet network was CJ1W ETN-21. The monitoring system was based on web as user's interface with the PLC, so the condition of the PLC inputs and outputs could be accessed remotely. From the results of this implementation, round trip time delay between computer and PLC could be measured . From the results of measurements that have been done, the result showed that the addition of background traffic on the network and increment of nodes that accessed the Ethernet module CJ1W ETN-21 could increase the round trip time delay between computer and PLC and decreased the throughput. Background traffic with UDP packet had more round trip time delay than background traffic with TCP data. Packet loss occurred while network has been giving 96% of background traffic.

Keyword: monitoring, PLC, network, Ethernet.

Subjek

Jaringan Multimedia
 

Katalog

PERANCANGAN DAN IMPLEMENTASI SISTEM MONITORING PLC (PROGRAMMABLE LOGIC CONTROLLER) OMRON CP1H VIA ETHERNET
 
 
Indonesia

Sirkulasi

Rp. 0
Rp. 0
Tidak

Pengarang

WULANSARI DARAWIJAYA
Perorangan
M.Ary Murti, Leanna Vidya Yovita
 

Penerbit

Universitas Telkom
Bandung
2010

Koleksi

Kompetensi

 

Download / Flippingbook

 

Ulasan

Belum ada ulasan yang diberikan
anda harus sign-in untuk memberikan ulasan ke katalog ini