PERENCANAAN REKONFIGURASI JARINGAN TRANSPORT DAN BACKBONE MICROWAVE PT. INDOSAT DI SUMATRA BAGIAN SELATAN (RECONFIGURATION PLANNING OF TRANSPORT AND BACKBONE MICROWAVE NETWORK PT INDOSAT IN SOUTH OF SUMATRA)

ARY KUSWORO

Informasi Dasar

116 kali
111010115
000
Karya Ilmiah - Skripsi (S1) - Reference

ABSTRAKSI: Pengguna telepon selular di Indonesia meningkat pesat karena kemudahannya. Seiring dengan itu teknologi telekomunikasi berbasis selular semakin berkembang. Untuk menarik banyak pelanggan, PT. Indosat perlu memberikan pelayanan yang baik dan kepuasan bagi pelanggan dalam berkomunikasi.
Dalam mengembangkan jaringan selular, PT. Indosat membangun link baru penyedia kanal untuk menyalurkan informasi dalam berkomunikasi. Untuk mendapatkan teknologi yang handal, cepat dan bandwidth besar menggunakan jaringan transmisi SDH dan PDH melalui link microwave.
Pada Tugas Akhir ini akan dibahas proses perencanaan jaringan seluler yang difokuskan pada perencanaan rekonfigurasi jaringan transport dan backbone microwave. Perencanaan ini meliputi inisialisasi atau kompilasi data (dari survey lapangan). Membuat konfigurasi jaringan yang menghubungkan link Padang – Jambi – Palembang – Bengkulu – Lampung (Sumatra bagian Selatan) dengan memperhitungkan kapasitas link backbone dan jarak antar backbone. Pemilihan perangkat radio mikrowave Siemens dengan memperhatikan frekuensi kerja, jenis antena, jenis saluran transmisi dan jenis modulasi yang digunakan. Path analysis (power link budget) terhadap redaman propagasi dan fading. Kemudian evaluasi terhadap hasil perencanaan dengan menggunakan tool software Pathloss 4.0 yang akan mempermudah proses perencanaan rekonfigurasi jaringan transport dan backbone microwave baik dari segi konfigurasi jaringan maupun analisa link budget pada masing-masing area.
Perencanaan rekonfigurasi jaringan transport dan backbone microwave ini untuk mencapai target link budget dan kriteria link transmisi serta tidak terjadi interferensi antar link transmisi berdasarkan ketetapan ITU-R. Perbaikan dilakukan dengan space diversity. Untuk link backbone mengacu pada rekomendasi ITU-R G 826 dengan ketetapan availability 99,999%. Jaringan transport berdasarkan rekomendasi ITU-R G 821 dengan ketetapan target availability 99,998%.Kata Kunci : ABSTRACT: Because of it’s easy of use, the user of cellular phone in Indonesia is growing bigger. Together with it, cellular based telecommunication technology also developing into better technology. To attract more customer, PT. Indosat need to give better service and satisafaction to the user when they use the communication service.
In developing cellular network, PT. Indosat build new channel provider link to convey the information in communication process. Using PDH and PDH transmission network through microwave link to get speed, big bandwidth, and reliable technology.
This final task will discuss about the process of cellular network planning focused on the reconfiguration planning of transport network and backbone microwave. This planning includes initialization or data compilation (from field survey). To make network configuration connecting Padang – Jambi – Palembang – Bengkulu – Lampung (southern part of sumatra) link, by counting backbone link capacity and the distance between backbone. To choose microwave radio Siemens equipment by it’s working frequency, kind of the antenna, kind of transmission channel, and kind of modulation used. Path analysis (power link budget) against propagation attenuation and fading. And then evaluation of the planning result using software tool Pathloss 4.0 which will make the reconfiguration planning process of transport network and backbone microwave easier, either about site configuration or link budget analysis on each area.
This Reconfiguration planning of transport network and backbone microwave is to achieve link budget target and transmission link criteria and also to prevent interference between one transmission link with another according to ITU-R rule. Improvement is done with space diversity. For backbone link refer to ITU-R G 826 recommendation, with 99,999% availability. Transport network refer to ITU-R G 821 recommendation with the target 99,998% availability.Keyword:

Subjek

other
 

Katalog

PERENCANAAN REKONFIGURASI JARINGAN TRANSPORT DAN BACKBONE MICROWAVE PT. INDOSAT DI SUMATRA BAGIAN SELATAN (RECONFIGURATION PLANNING OF TRANSPORT AND BACKBONE MICROWAVE NETWORK PT INDOSAT IN SOUTH OF SUMATRA)
 
 
Indonesia

Sirkulasi

Rp. 0
Rp. 0
Tidak

Pengarang

ARY KUSWORO
Perorangan
-
 

Penerbit

Universitas Telkom
Bandung
2006

Koleksi

Kompetensi

 

Download / Flippingbook

 

Ulasan

Belum ada ulasan yang diberikan
anda harus sign-in untuk memberikan ulasan ke katalog ini