ANALISIS PENJADWALAN PROYEK MENGGUNAKAN METODE CRITICAL PATH METODE (CPM) (STUDI KASUS: DISMANTLE AND ERECTION TANGKI BOLA(SPHERICAL TANK) BELAWAN, SUMATERA UTARA) - Dalam bentuk buku karya ilmiah

FIRMAN PUTRA PERMADI

Informasi Dasar

291 kali
25.04.746
000
Karya Ilmiah - Skripsi (S1) - Reference

Effective project scheduling is crucial in project management to ensure timely completion and minimize the risk of delays. This study analyzes project scheduling using the Critical Path Method (CPM) for the Dismantle and Erection Spherical Tank project by PT. Rekabangun Energi Nusantara. Data was obtained through field observations, interviews, and project documents. By applying the CPM method using Microsoft Project, the project’s initial duration of 110 days was optimized to 98 days, achieving a 10.9% time efficiency with a 12-day reduction in project duration. The project’s critical path includes key activities such as Work Permit and HSE Plan, Dismantle Work, and Erection and Welding Work. Progress monitoring was conducted using the Curve-S graph to compare actual progress against the planned baseline. Resource efficiency was achieved by optimizing the workforce in the welding and rigging sections and improving the effectiveness of heavy equipment usage, such as cranes and generato

Subjek

MANAJEMEN PROYEK
 

Katalog

ANALISIS PENJADWALAN PROYEK MENGGUNAKAN METODE CRITICAL PATH METODE (CPM) (STUDI KASUS: DISMANTLE AND ERECTION TANGKI BOLA(SPHERICAL TANK) BELAWAN, SUMATERA UTARA) - Dalam bentuk buku karya ilmiah
 
xi, 61p.: il,; pdf file
Indonesia

Sirkulasi

Rp. 0
Rp. 0
Tidak

Pengarang

FIRMAN PUTRA PERMADI
Perorangan
Aswan Munang, Famila Dwi Winati
 

Penerbit

Universitas Telkom, S1 Teknik Industri - Kampus Purwokerto
Bandung
2025

Koleksi

Kompetensi

  • BAK4DAB2 - MANAJEMEN PROYEK INDUSTRI

Download / Flippingbook

 

Ulasan

Belum ada ulasan yang diberikan
anda harus sign-in untuk memberikan ulasan ke katalog ini