pT. Aditec Cakrawiyasa Plant 2 is one of manufacturing company that produce
gas regulator and cart production. Between these two products, the gas
regulator
will be the main focus because the whole production process describe well from
this product. There are some types of gas regulator, but QRL
032 takes the
highest demand among the others for 2014. There are some problems that found
from this produ
ction floor layout, such as there was backtracking and cross
tracking process that will cause the total material flow become higher. And in Die
Casting Department, there was bottleneck process happened because both
machines cannot meet the expected quantit
y for one day. Based on this problem,
this research aim is to design facility layout for PT. Aditec Cakrawiyasa Plant 2
using SA
CRAFT Algorithm to minimize the material handling moment. SA
CRAFT algorithm can provide a solution that is close to the optim
al solution. The
production floor and material flow will be the primary data. After that, these data
will be processed to develop initial layout based on the routing sheet and the
production floor area. Activity Relationship Chart (ARC) will help to define
the
relationship activity for each department to develop the initial layout that will be
the input data to get the suggested layout. Developing From to Cha
r
t (FTC) will
be used to calculate the material handling moment by multiplying the flow
frequency an
d flow distance of the initial layout. After getting the suggested
layout, it will be compared with the existing layout based on the total of material
handling moment. The suggested layout gives the total moment reduction around
7.59% from 2299 become 2124
.5 Facility Layout, SA - CRAFT Algorithm, Material Handling Moment