DESIGNING FACILITY LAYOUT OF PT ADITEC CAKRAWIYASA PLANT 2 USING SA-CRAFT ALGORITHM TO MINIMIZE MATERIAL HANDLING MOMENT

Anisah Nurjulianti

Informasi Dasar

112100165
658.501
Karya Ilmiah - Skripsi (S1) - Reference

pT. Aditec Cakrawiyasa Plant 2 is one of manufacturing company that produce gas regulator and cart production. Between these two products, the gas regulator will be the main focus because the whole production process describe well from

this product. There are some types of gas regulator, but QRL

032 takes the highest demand among the others for 2014. There are some problems that found
from this produ

ction floor layout, such as there was backtracking and cross

tracking process that will cause the total material flow become higher. And in Die Casting Department, there was bottleneck process happened because both machines cannot meet the expected quantit y for one day. Based on this problem, this research aim is to design facility layout for PT. Aditec Cakrawiyasa Plant 2

using SA

CRAFT Algorithm to minimize the material handling moment. SA

CRAFT algorithm can provide a solution that is close to the optim al solution. The production floor and material flow will be the primary data. After that, these data will be processed to develop initial layout based on the routing sheet and the production floor area. Activity Relationship Chart (ARC) will help to define the relationship activity for each department to develop the initial layout that will be the input data to get the suggested layout. Developing From to Cha r t (FTC) will be used to calculate the material handling moment by multiplying the flow frequency an d flow distance of the initial layout. After getting the suggested layout, it will be compared with the existing layout based on the total of material handling moment. The suggested layout gives the total moment reduction around 7.59% from 2299 become 2124 .5 Facility Layout, SA - CRAFT Algorithm, Material Handling Moment

Subjek

Industri engineering
 

Katalog

DESIGNING FACILITY LAYOUT OF PT ADITEC CAKRAWIYASA PLANT 2 USING SA-CRAFT ALGORITHM TO MINIMIZE MATERIAL HANDLING MOMENT
 
 
Indonesia

Sirkulasi

Rp. 0
Rp. 0
Tidak

Pengarang

Anisah Nurjulianti
Perorangan
Muhammad Iqbal, ST., MM; Ika Arum Puspita, ST
 

Penerbit

Universitas Telkom, S1 Teknik Industri
Bandung
2014

Koleksi

Kompetensi

 

Download / Flippingbook

 

Ulasan

Belum ada ulasan yang diberikan
anda harus sign-in untuk memberikan ulasan ke katalog ini