PERANCANGAN DAN REALISASI SISTEM MONITORING CATU DAYA BTS BERBASIS MIKROKONTROLER (DESIGN AND REALIZATION OF MONITORING SYSTEM OF BTS POWER SUPPLY BASED ON MICROCONTROLLER )

FITRIA SRI HARTIFA

Informasi Dasar

611080113
621.381
Karya Ilmiah - TA (D3) - Reference

ABSTRAKSI: BTS (Base Transceiver Station) merupakan sarana penting dalam jaringan selular sebagai titik akses para pengguna mobile cellular. Dalam pengoperasian BTS, memerlukan sistem catu daya yang tidak boleh terputus sehingga diperlukan sumber catu daya cadangan berupa Genset, yang mana akan dijalankan saat sumber utama dari listrik PLN mati. Pemindahan switch dari PLN ke Genset atau sebaliknya dilakukan oleh ATS (Automatic Tranfer Switch) secara otomatis. Sebelum Genset menyala dengan stabil, terdapat sumber catu daya cadangan untuk mensuplai beban BTS yaitu baterai yang terhubung dengan rectifier sebelumnya.

Berdasarkan permasalahan tersebut, Proyek Akhir ini dirancang dan direalisasikan sebuah alat pendeteksian PLN, Genset, ATS, rectifier, dan beban pada saat keadaan aktif atau tidak aktif dengan menggunakan relay serta ketinggian level permukaan bahan bakar Diesel (solar) dalam tangki bahan bakar Genset dengan menggunakan sensor ultrasonic. Hasil dari deteksi sensor ultrasonic akan ditampilkan di LCD (Liquid Crystal Display). Sistem monitoring ini akan diproses oleh mikrokontroler yang dihubungkan langsung ke HP, yang dapat memberikan perintah SMS (Short Message Service) AT Command ke pusat pengawasan secara otomatis.

Hasil pengujian menunjukkan bahwa waktu pengiriman SMS tercepat adalah pukul 05.00 dengan rata-rata sebesar 5,68 detik dan waktu pengiriman SMS terlama adalah pukul 20.00 dengan rata-rata sebesar 8,5 detik. Kemudian tingkat keberhasilan pengiriman SMS yaitu 90% sampai 95%.Kata Kunci : Relay, Sensor Ultrasonic, Mikrokontroler, LCD, SMS, BTSABSTRACT: BTS (Base Transceiver Station) is an important tool in a cellular network as an access point of mobile phone users. In the operation of the BTS, need power supply system that can not be interrupted so that backup power supply in the form of Genset is needed, which will be executed when the main power supply from PLN disconnected. The transfer switch from PLN to the Genset or otherwise performed by the ATS (Automatic Transfer Switch) automatically. Before Genset work with stable, there is a backup power supply that supply the load on the BTS, in the form of battery that connected with the previous rectifier.

Based on these problems, the final project designed and realized as PLN, Genset, ATS, rectifier, and load detector when on or off by using relay. And then the surface level of diesel fuel detector in Genset fuel tank by using ultrasonic sensors. The surface level that detected by ultrasonic sensor will be displayed on the LCD (Liquid Crystal Display). The monitoring system will be processed by microcontrollers, which directly connected is mobile phone, that can send SMS(Short Message Service) AT-Command to monitoring center automatically.

Testing result show that the fastest time to send SMS is at 5am with the average result is 5,68 seconds. The longest time to send SMS is at 8pm with the average result is 8,5 seconds. And then the success rate of SMS delivery is 90% to 95%.Keyword: Relay, Ultrasonic Sensors, Microcontroller, LCD, SMS, BTS

Subjek

Sistem Elektronika
 

Katalog

PERANCANGAN DAN REALISASI SISTEM MONITORING CATU DAYA BTS BERBASIS MIKROKONTROLER (DESIGN AND REALIZATION OF MONITORING SYSTEM OF BTS POWER SUPPLY BASED ON MICROCONTROLLER )
 
 
Indonesia

Sirkulasi

Rp. 0
Rp. 0
Tidak

Pengarang

FITRIA SRI HARTIFA
Perorangan
Asep Mulyana, M. ARY MURTI ..
 

Penerbit

Universitas Telkom
Bandung
2011

Koleksi

Kompetensi

 

Download / Flippingbook

 

Ulasan

Belum ada ulasan yang diberikan
anda harus sign-in untuk memberikan ulasan ke katalog ini