Grupo Lindo Ecuador: Air Gas Production Project For Acería Ecuatoriana

María Elizabeth Arteaga

Informasi Dasar

74 kali
24.10.509
658.404
Case Studies
Tel-U Gedung Manterawu Lantai 5 : Rak 20
Tel-U Purwokerto : Rak 8

At the start of 2013, Acería Ecuatoriana, because of a million-dollar investment that had been started by its general manager, Pérez, increased its melting and steel production capacity from 100,000 tons per year to 220,000 tons per year. This implied a greater demand for industrial gases and require its main additional supplier to deliver. Demand increase caused Grupo Lindo Ecuador´s plant saturation, unit separation air 1. For this reason, Grupo Lindo Ecuador had to import considerable oxygen amounts and this increased its cost of production. This caused Cadena to seek the establishment of a strategic alliance with Acería Ecuatoriana, for the purpose of developing a project for gas production (oxygen, nitrogen and argon). In September of the same year, Nelson became interested but required to know the Grupo Lindo Ecuador project proposal before signing the strategic alliance.

Subjek

PROJECT MANAGEMENT
 

Katalog

Grupo Lindo Ecuador: Air Gas Production Project For Acería Ecuatoriana
ISSN: 2045-0621
21p.: pdf file.; 337 KB
English

Sirkulasi

Rp. 0
Rp. 0
Tidak

Pengarang

María Elizabeth Arteaga
Perorangan
 
 

Penerbit

Emerald
New York
2021

Koleksi

Kompetensi

 

Download / Flippingbook

 

Ulasan

Belum ada ulasan yang diberikan
anda harus sign-in untuk memberikan ulasan ke katalog ini