Informasi Umum

Kode

112100092

Klasifikasi

658.5 - Management of production, Production management in manufacturing enterprises, Production managmeent in service industries, Comprehensive works on logistics

Jenis

Karya Ilmiah - Skripsi (S1) - Reference

Subjek

Management Production

Informasi Lainnya

Abstraksi

ABSTRAKSI: CV. MKS merupakan sebuah perusahaan yang memiliki masalah pada gudang. Pada bulan Januari 2014, CV. MKS menyewa sebuah bangunan (Gudang II CV. MKS) yang digunakan untuk menyimpan persediaan kaca dan aluminium, serta melakukan proses pemotongan kaca yang selanjutnya akan dikirim ke pelanggan. Salah satu permasalahan pada Gudang II CV. MKS adalah inventory level maksimum material kaca yang melebihi kapasitas penyimpanan dikarenakan pemindahan fasilitas dari Gudang I CV. MKS dilakukan secara bertahap dan belum diadakan pemindahan seluruh fasilitas. Selain itu, untuk mendukung aktivitas di dalam gudang, perusahaan berencana untuk menambah sejumlah fasilitas dan workstation. Berdasarkan beberapa masalah yang telah dipaparkan, perlu dilakukan perancangan tata letak fasilitas pada gudang untuk meminimasi biaya material handling dengan memaksimalkan utilitas ruang gudang dan meminimasi momen perpindahan aliran material dengan menggunakan algoritma BLOCPLAN. Algoritma BLOCPLAN digunakan sebagai algoritma konstruksi maupun algoritma perbaikan. Rancangan tata letak dengan menggunakan algoritma BLOCPLAN menghasilkan peningkatan utilitas ruang gudang sebesar 40,23% dan penurunan momen perpindahan sebesar 17,95% dengan meminimasi biaya material handling sebesar 10,87%.KATA KUNCI: Gudang, Utilitas, Inventory Level, Tata Letak, BLOCPLANABSTRACT: CV. MKS is a company that has problems in its warehouse. In January 2014, CV. MKS rented a building (Warehouse II CV. MKS) that used to store glass and aluminium inventory, and do cutting process of glass which will be sent to the customer. One of the problems is the maximum inventory level of glass material exceeds the storage capacity, due to the movement of facility from Warehouse I CV. MKS is done in stages and has not held the entire transfer facility. In addtion, the company plans to add some facilities and work stations. Based on some of issues that have been presented, it is necessary to design the facility layout of this warehouse to minimize material handling costs by maximizing the utility of warehouse space and minimizing the movement moment of flow materual using BLOCPLAN algorithm. BLOCPLAN algorithm is used as construction algorithm and improvement algorithm. The layout design using BLOCPLANalgorithm resulted in increased warehouse space utility of 40,23% and decreased moment movement of 17,95% with decreased material handling cost of 10,87%.KEYWORD: Warehouse, Utilities, Inventory Level, Layout, BLOCPLAN

Koleksi & Sirkulasi

Tersedia 1 dari total 1 Koleksi

Anda harus log in untuk mengakses flippingbook

Pengarang

Nama Sevilla Dyahpramesti
Jenis Perorangan
Penyunting Muhammad Iqbal , Muhammad Nashir Ardiansyah
Penerjemah

Penerbit

Nama Universitas Telkom
Kota Bandung
Tahun 2014

Sirkulasi

Harga sewa IDR 0,00
Denda harian IDR 0,00
Jenis Non-Sirkulasi