<p>PT. XYZ, a growing windshield manufacturer, faces a significant production</p>
<p>capacity deficit, leading to an unsustainable reliance on costly overtime to meet</p>
<p>demand surges driven by e-commerce promotions. This research aims to improve</p>
<p>the company's capacity planning by implementing a formal Rough Cut Capacity</p>
<p>Planning (RCCP) framework to analyze the problem and evaluate strategic</p>
<p>solutions. The methodology involved developing a Causal Regression model,</p>
<p>which was validated as the most accurate forecasting tool with a Mean Absolute</p>
<p>Deviation This forecast was used to create a "pulsed" Master Production Schedule</p>
<p>(MPS). An RCCP analysis was then performed using a scaled Bill of Labor</p>
<p>Approach (BOLA), which quantitatively proved a significant capacity deficit. An</p>
<p>evaluation of alternatives, including overtime and adding new machinery, revealed</p>
<p>that no single strategy is a complete solution. The research concludes that the most</p>
<p>effective solution is a hybrid strategy: a primary investment in a new machine to</p>
<p>address the fundamental capacity shortage, supplemented by the use of planned</p>
<p>overtime to manage the remaining absolute peak demand.</p>
<p><b><i>Key words: RCCP, forecasting, Causal regression, MPS, BOLA</i></b></p>
Tersedia 1 dari total 1 Koleksi
| Nama | GHILMAN ILHAMUL BAAQI |
| Jenis | Perorangan |
| Penyunting | Ayudita Oktafiani, Tatang Mulyana |
| Penerjemah |
| Nama | Universitas Telkom, S1 Teknik Industri (International Class) |
| Kota | Bandung |
| Tahun | 2025 |
| Harga sewa | IDR 0,00 |
| Denda harian | IDR 0,00 |
| Jenis | Non-Sirkulasi |