On 14th June 2017, the Grenfell Tower in North Kensington, West London, UK, caught fire. The fire raged for 60?h and around 72 people lost their lives. Many criticized the response of the London Fire Brigade (LFB) and their lack of preparedness to respond to such an emergency. There were calls for Dany Cotton, the Chief of LFB, to resign. However, there had been a major cladding-related refurbishment at Grenfell, and subsequent investigations revealed that the use of combustible materials, a lack of compliance with the fire-safety norms and a blatant disregard for resident safety had contributed to the fire. The tragedy was a cumulative outcome of failure on two counts: effective project management and stakeholder management during the process of refurbishment, especially in the context of a low-cost housing project. Given this situation, this case considers whether Dany Cotton should own up to her responsibility and resign from her position. In the process, the case considers Grenfell refurbishment from the theoretical lens of project management in the construction management scenario to understand the factors that could have led to an “avoidable” tragedy.

Koleksi & Sirkulasi

Tersedia 1 dari total 1 Koleksi

Anda harus log in untuk mengakses flippingbook

Pengarang

Nama Prashanth Kumar Sreram, Savitha Chilakamarri
Jenis Perorangan
Penyunting
Penerjemah

Penerbit

Nama Emerald Publishing Limited
Kota New York
Tahun 2023

Sirkulasi

Harga sewa IDR 0,00
Denda harian IDR 0,00
Jenis Non-Sirkulasi

Download / Flippingbook