pT. Aditec Cakrawiyasa Plant 2 is one of manufacturing company that produce gas regulator and cart production. Between these two products, the gas regulator will be the main focus because the whole production process describe well from
032 takes the highest demand among the others for 2014. There are some problems that found <br> from this produ
tracking process that will cause the total material flow become higher. And in Die Casting Department, there was bottleneck process happened because both machines cannot meet the expected quantit y for one day. Based on this problem, this research aim is to design facility layout for PT. Aditec Cakrawiyasa Plant 2
CRAFT algorithm can provide a solution that is close to the optim al solution. The production floor and material flow will be the primary data. After that, these data will be processed to develop initial layout based on the routing sheet and the production floor area. Activity Relationship Chart (ARC) will help to define the relationship activity for each department to develop the initial layout that will be the input data to get the suggested layout. Developing From to Cha r t (FTC) will be used to calculate the material handling moment by multiplying the flow frequency an d flow distance of the initial layout. After getting the suggested layout, it will be compared with the existing layout based on the total of material handling moment. The suggested layout gives the total moment reduction around 7.59% from 2299 become 2124 .5 Facility Layout, SA - CRAFT Algorithm, Material Handling Moment
Tersedia 1 dari total 1 Koleksi
Nama | Anisah Nurjulianti |
Jenis | Perorangan |
Penyunting | Muhammad Iqbal, ST., MM; Ika Arum Puspita, ST |
Penerjemah |
Nama | Universitas Telkom, S1 Teknik Industri |
Kota | Bandung |
Tahun | 2014 |
Harga sewa | IDR 0,00 |
Denda harian | IDR 0,00 |
Jenis | Non-Sirkulasi |