112100131
658.501 - industri
Karya Ilmiah - Skripsi (S1) - Reference
Industri Engineering
163 kali
The development in industry today is growing very fast during with the improvement of service for customer. P T. SMA is the one of manufactur ing company which produce s the motorcycle. When sending the motorcycle component, suppliers have their own schedule ba sed on cycle issue. There are 96 suppliers in raw material warehouse 1 and the amount of SKU are 1026 SKU?s. This research is focused in the scheduling of supplier arrival which do the unloading every day (54 suppliers). In r eality the irregularity of supplier arrival is found . This situation was caused by the long time of unloading activity each supplier because of the amount of material handling equipment was limit . Because of that, in this research is made for the improvement for scheduling of supplier arrival considering the limitation of material handling equipment using integer linear programming method. The solution use matlab to generate the arrival schedule of supplier with the smallest makespan supplier unloading time. The result is the shorter of makespan time total from 95 to 80 time interval . Compared with the existing condition, the time is decreas ing as much as 15 time interval or 75 minutes or 15,78% f rom the whole supplier unloading time integer linear programming, scheduling, supplier, material handling equipment
Tersedia 1 dari total 1 Koleksi
Nama | Ulfa Latifarani Magestri Chaidir |
Jenis | Perorangan |
Penyunting | Budi Sulistyo, Murni Dwi Astuti |
Penerjemah |
Nama | Universitas Telkom, S1 Teknik Industri |
Kota | Bandung |
Tahun | 2014 |
Harga sewa | IDR 0,00 |
Denda harian | IDR 0,00 |
Jenis | Non-Sirkulasi |