Abstraksi

According to PT. XYZ historical production demand and output data for 2016, there were eight months unmet demand for Medium Voltage (MV) electrical panel. One of the problem that causing it was inadequate manpower. Since there were only managerial judgment for determining manpower, a proper study to determine manpower demand should be taken in account. Thus, this research objective was determining manpower needed using Predetermined-Time System (PTS). MTM-UAS which one of the tools from PTS was used to determine the standard time in MV production division. Standard time for each workstations were gathered and it used to calculate manpower needed. Takt time that determined from forecasted production demand and company working hour also taken place in determining manpower needed. Forecasted manpower needed was determined, the result was used to find the minimum average percent gap of manpower. With using 70% of allowance value, the gap was determined on 13.01%. The gap of 7.25% could be discovered after calculation using brute-force technique done, the result was decrease on the new allowance value on 63%. The optimal manpower demand could be determined using 63% allowance value. Alternatives and recommendations was also given to reconcile the manpower demand and supply in order to case the production demand.

Koleksi & Sirkulasi

Tersedia 1 dari total 1 Koleksi

Anda harus log in untuk mengakses flippingbook

Pengarang

Nama ZANUAR GALANG BEWANA
Jenis Perorangan
Penyunting CHRISTIANTO TRIWIBISONO, LITASARI WIDYASTUTI
Penerjemah

Penerbit

Nama Universitas Telkom
Kota BANDUNG
Tahun 2017

Sirkulasi

Harga sewa IDR 0,00
Denda harian IDR 0,00
Jenis Non-Sirkulasi